Preview build. Not indexed.

Baths and fit outs

Bath guides covering standard sizes and access routes, fitting a panel, and replacing a bath with a shower, with the plumbing checks for each task.

Reading

In this section

A brass-finish overflow cover on a white bath

A bath is easy to order and awkward to get wrong: it has to fit the walls, the waste position and the route into the room. These guides take those in turn.

Choose a guide

Check these three things early

  1. The weight of a full bath. Each litre of water weighs about a kilogram, on top of the bath and the person in it. Raise any doubt about the floor with a builder or surveyor.
  2. Water notification. A bath holding more than 230 litres to the overflow centre line must be notified to the water company before installation.
  3. Age of the existing panel and boards. In homes built or refurbished before 2000, some materials can contain asbestos. Do not cut anything you cannot identify.

Tiling, flooring, plastering and electrical work are separate trades. Decide who is doing each one before the old bath comes out.

One list, however many jobs

Add what needs fitting or replacing, tell us the postcode, then email photos.

Send my job list