Preview build. Not indexed.

Compatibility checklist for a new suite

Bathroom shopping checklist to confirm a new suite is compatible: toilet, basin, bath, shower, taps, wastes, pressure, access and returns before you pay.

Use this checklist before paying for a bathroom suite. It tests whether the pieces suit your home and each other. For measuring the spaces, use the measuring sheet.

Your home

  • Hot water system identified: gravity, combination boiler or cylinder.
  • Lowest expected pressure noted for shower and taps.
  • Soil outlet: wall or floor, position recorded.
  • Floor type and any weight concern for the bath.
  • Delivery route measured.
  • Lease or landlord consent obtained.

Toilet

  • Pan outlet matches, or connector within range.
  • Seat included? Fixing type known.
  • Cistern inlet side suits pipe.
  • Flush complies with the 6 litre limit.
  • Frame and flush plate matched for wall-hung.
  • Spare fill and flush valves available.

Basin and taps

  • Tap holes match tap layout.
  • Overflow and waste type match.
  • Spout reach lands in bowl.
  • Tap minimum pressure suits system.
  • Trap fits inside unit or pedestal.
  • Wall can carry the fixing method.

Bath

  • Size, handing and waste end correct.
  • Legs and panel included.
  • Tap holes drilled as wanted.
  • Overflow waste compatible.
  • Capacity checked: over 230 litres is notifiable to the water company.

Shower

  • Tray size, waste position, upstands.
  • Waste rated for the shower flow.
  • Screen fits tray and wall.
  • Valve suitable for pressure and pipe spacing.
  • Hose cannot create a backflow risk with toilet or bidet, see shower guidance.
  • Electric shower: electrician consulted.

Heating, light and air

  • Towel rail pipe centres and heat output.
  • Electric elements and sockets planned with an electrician.
  • Fan chosen and duct route agreed.

Approvals and standards

  • Water fittings approved or evidenced for UK use.
  • Notification needed? Ask the water company.
  • Building control needed for new drains, layout or circuits?

Parts often forgotten

Item Buy
Pan connector To suit measured outlet
Flexible tails or connectors Correct thread
Isolating valves One per supply
Waste and trap Per fitting
Wall fixings For your wall type
Sealant Sanitary grade

Order and returns

  • Drawings downloaded and filed.
  • Delivery date later than any templating.
  • Boxes inspected on arrival.
  • Return period covers the fitting date.
  • Warranty conditions read.

Final comparison

Put each drawing beside your room plan. Resolve every unticked box in writing. If two products disagree on a connection, ask the suppliers before ordering.

To have your list looked over for plumbing fit, send it through the contact form and email product links and job photos quoting your reference.

Questions people ask

What should I check first?

Your water system and the soil position, because they rule out many products.

Are bathroom suites complete?

Often not. Seats, wastes, taps, fixings and flush pipes may be sold separately.

One list, however many jobs

Add what needs fitting or replacing, tell us the postcode, then email photos.

Send my job list