Pipework planning for a kitchen refit or alteration, covering sink, appliances, isolation and waste falls, plus what to send us and how joints are tested.
Kitchen plumbing ties together the sink, the appliances and the routes that serve them. This page is for a refit, a moved sink or several connected changes; single tasks have pages under kitchen and utility.
What the job involves
Supplies and wastes are surveyed against the new unit plan. Old pipes that no longer serve anything are removed back or capped properly. New runs are clipped and positioned so drawers, appliance backs and shelves clear them. The sink waste, appliance branches and valves are arranged to remain reachable. Where an island is planned, the waste route under the floor usually decides whether the position works.
Working with the fitter
Agree the sequence with whoever installs the units and worktops:
- supplies capped safely while old units come out;
- first fix once positions are marked on the wall;
- holes in cabinet backs set from measured pipe centres;
- sink and tap connected after the worktop is fixed;
- appliances pushed home only after their hoses have been tested.
What we need from you
The kitchen drawing with dimensions, photos under the current sink and behind accessible appliances, model details for the sink, tap and machines, floor type and the planned dates of other trades. Tell us if there is a water softener, filter, boiling water tap or waste disposal unit, since each needs space and connections of its own.
Gas hobs, cookers and their pipes are a separate job under gas cooker and hob connection, carried out only by Gas Safe registered engineers. Cooker circuits and new sockets are electrical work.
Safe first steps
Locate the stop valve and confirm that it shuts the water fully before demolition day. Do not drive screws or cut into walls near visible pipe runs without checking for concealed pipes and cables. Pull appliances out gently so hoses are not torn off, and keep a bowl and cloths ready for water left in them.
How it is checked
Each valve is opened in turn and its joint inspected. The bowl is filled and released, appliances are run through filling and draining, and the cupboard floor is checked during and afterwards. Hoses are looked at once the appliance is in its final place, because pushing it back can crush a loop. Check again after the first few days of normal use.
Sinks, wastes and refit details
For the sink itself, see how the job is affected by an inset bowl, Belfast sink support, Belfast wastes, waste hole sizes, fitting the strainer, one and a half bowl kits, overflow kits, taking the old sink out and how the parts connect.
Refit planning covers first fix information, pipe heights, trap shapes, a sink in an island, a worktop change, boiling water tap space, choosing a disposal unit and softener space and drainage.
Water fittings rules
Fittings on a public water supply have to meet the water fittings requirements, which include backflow protection and means of isolation. Ask how the proposed connections satisfy them. Email your drawing details, after describing the job on the contact form.
What can go wrong with timing
Worktop templating, appliance delivery and sink supply often fall on different dates. List who is bringing the tap, waste kit and hoses, and open the boxes early to check nothing is missing. A late part is easier to manage when temporary capping has been planned.