What to settle before kitchen first fix: sink and appliance positions, waste heights, isolation valves, hidden joints, extraction and photos before closing up.
First fix is the stage where water supplies and waste pipes are run to their finishing points while walls and floors are still open. Your fitter needs a dimensioned kitchen plan, the model of every plumbed item, and a decision about where each valve and trap will be reached afterwards. Gas pipework, including a cooker or hob supply, is planned separately and installed only by a Gas Safe registered engineer: ask to see their ID card and check it on the Gas Safe Register.
Hand over a plan that has measurements
A coloured design view is not enough. Mark each plumbed item from one fixed corner, give its distance along the wall, and say which finished surfaces the figures are taken from. Plaster, tile backing and a new floor all move the finished line.
List every item that takes or discharges water:
| Item | What the fitter needs to know |
|---|---|
| Sink | Number of bowls, bowl depth, waste outlet position, tap holes |
| Tap | Single mixer, pull-out, filtered or boiling type |
| Dishwasher | Model, width, which side of the sink |
| Washing machine | Model, whether it stays in the kitchen |
| Fridge freezer | Plumbed dispenser or ice maker, or none |
| Extras | Water softener, waste disposal unit, coffee machine |
If a model is undecided, say so. A pipe left in a guessed position is often the one that has to be moved.
Decide where waste will go
Waste needs fall, so it limits the layout more than supply pipes do. Approved Document H gives a 40 mm trap with a 75 mm seal for sinks, washing machines and dishwashers. Its guidance for an unventilated sink branch is up to 3 m in 40 mm pipe or 4 m in 50 mm pipe, laid at a fall of 18 to 90 mm per metre. A pipe shared by several appliances may need to be larger.
Ask the fitter to say, before anything is covered, where the branch joins a stack or drain and how each trap can be removed for cleaning. Check that kitchen waste reaches the foul system. Thames Water warns that appliances connected to surface water drains are misconnections.
Ask for valves you can reach
The water fittings requirements call for enough servicing valves and drain taps to limit water lost when fittings are maintained or replaced. In a kitchen, a sensible request is a labelled valve for the hot tap, the cold tap and each appliance, all inside a cabinet where a hand can turn them with the appliance still in place.
Joints matter too. Under the same rules, fittings may not be embedded in a wall or solid floor, and joints and operable parts must not be concealed. Say early if you want pipes chased or run under a screed, because the route has to be designed around ducts and access.
Coordinate the other trades
- Electrician: sockets and fused spurs should not sit where a waste or leaking valve can wet them. New kitchen wiring is the electrician's design.
- Ventilation: Approved Document F gives extract rates for kitchens, which vary with whether a cooker hood vents outside.
- Kitchen fitter: drawer boxes, corner units and appliance backs need space around pipes.
- Floor layer: a raised floor changes appliance height and can trap a dishwasher behind the worktop.
Before the walls close
Ask for the new pipework to be pressure tested and flushed, and check it yourself with the fitter present. Then take straight-on photographs of each wall and floor run with a tape measure visible. Write the distances on the plan. Those pictures are what stops a later screw going through a pipe.
Agree what second fix will include: connecting the tap and waste, fitting appliances, sealing the sink and testing under full flow. These are often booked weeks later, so note who supplies the traps, valves and hoses.
Older homes
Before anyone cuts into old boards, textured coatings or floor tiles, consider whether they may contain asbestos; the HSE asbestos pages explain the risk. In flats, check whether the freeholder must approve pipe moves or a water shut-off.
To ask for first fix work, describe the room in the contact form and say what stage the build has reached. When you receive a reference, email the plan, appliance links and photos of the existing stop valve and waste connection.
Questions people ask
When should first fix happen in a kitchen?
After the old units are out and the layout is fixed, but before plaster, floor finishes and new cabinets cover the pipe routes.
Do I need the sink before first fix?
You need its drawing at least. Bowl count, waste position and tap hole decide where the waste and supplies should end.