Downstairs toilet installation planned properly: find a drainage route, bring hot and cold water, provide extraction and a basin, and check approvals first.
A downstairs toilet needs four things settled before any fitting is chosen: a way for waste to reach the foul drain, a water supply, ventilation, and a place for hand washing. If you can describe where each will come from, the rest is ordinary fitting work.
Drainage
Find the nearest soil stack, branch or inspection cover. Gravity drainage needs a continuous fall. Approved Document H shows a 100 mm branch for a toilet with an outlet over 80 mm, a minimum fall of 18 mm per metre for a single connection and two unventilated lengths (15 m in a table, 6 m for one WC in a diagram; keep to 6 m), with extra rules where a ground floor toilet connects directly to a drain.
Breaking into a drain or stack, and any excavation, may be work for a drainage contractor. A shared drain can belong to the water company, so confirm before cutting.
Where no gravity route exists, a macerator and pump may be possible. Approved Document G conditions this on there also being access to a toilet that discharges directly to a gravity system, among other requirements. So it is not an answer for a home's only toilet.
Water
- Cold supply to the cistern with a servicing valve beside it.
- Hot and cold, or a suitable water heater, for the basin.
- A route that avoids burying joints in walls or solid floors.
Ventilation
Approved Document F lists an intermittent extract rate of 6 litres per second for sanitary accommodation, with opening-window purge ventilation as an alternative. Plan the duct route to outside. The fan's wiring belongs to an electrician.
Room and approvals
Check the space needed and the building regulations points. Speak to building control before work, and to your freeholder if you hold a lease.
What the plumbing visit covers
Agree this in writing for your own job:
| Item | Decide who supplies or does it |
|---|---|
| Pan, cistern, basin, tap | You or the plumber |
| Supply pipes and valves | Plumber |
| Waste branch inside the room | Plumber |
| Drain connection outside | Possibly drainage contractor |
| Fan, lighting, sockets | Electrician |
| Stud walls, door, plaster, floor | Builder or joiner |
What to send
- A floor sketch with wall lengths, door and ceiling height.
- Photos of the proposed space, including under any stairs.
- Photos outside the nearest wall showing pipes, gullies and covers.
- Floor construction: timber or solid.
- Property type, and whether you rent or lease.
- Any fittings already bought.
Send the notes through the contact form and email the photos with your reference. Ask for the price and exactly what it includes before agreeing, and ask who coordinates the other trades. No price is published here because drainage distance and building work vary too much between homes.

