A vertical radiator puts the weight of steel and water onto a narrow strip of wall, and it often needs pipes in different places from the radiator it replaces. Confirm the wall, the connection layout and how the heating system will be drained before buying. Work on gas boilers and gas pipes belongs to a Gas Safe registered engineer.
The wall
Find out what is behind the surface at the exact bracket positions: solid brick, block, dot and dab board, timber stud or metal stud. A vertical radiator installation guide for hook hung models states that its instructions and supplied fixings assume sufficiently strong masonry, and that the installer must adapt them for other walls. Zehnder's Cove instructions tell the fitter to drill for fixings appropriate to the wall type.
Look up the weight, add the water content, and choose fixings or a timber support to match. If brackets would fall between studs, add noggins before boarding or pick another position. Check for pipes and cables before drilling.
The connections
| Dimension | Check |
|---|---|
| Pipe centres | Distance between valve tails on the new radiator |
| Distance from wall | Varies with bracket depth |
| Height of tappings | Valves must clear skirting and floor |
| Connection style | Bottom opposite ends, central, or side |
| Thermostatic head | Space to sit as its maker allows |
A vertical model is usually much narrower than a horizontal one, so existing pipes rarely line up. Moving them can mean lifting floors or exposing a chase. Surface pipes avoid that but remain visible.
Flow direction
Tall radiators often contain a flow diverter. The hook hung guide above says the blocker must be on the hot water flow side and that a sticker usually marks it. Fit it the wrong way and the radiator may heat poorly. Identify flow and return before draining.
Heat output
Do not match by size alone. Compare the stated output of the old and new radiators at the same temperature difference, and consider the room. A heating designer can calculate the need.
Installation sequence
- Check for a sealed or open-vented system and how it refills.
- Isolate the heating and let it cool fully.
- Drain to below the connection points, protecting floors.
- Mark brackets with a level and fix them.
- Fit air vent, blanking plug and valve tails to the radiator with the sealing method specified.
- Hang it with help and lock the retaining hooks.
- Connect pipes without pulling the radiator out of plumb.
- Flush as needed and refill.
The Zehnder sheet calls for the system to be drained, cleaned and flushed in line with BS 7593 and for inhibitor to be added before the radiator goes in.
Commissioning
Bleed from the top vent, restore the system pressure if it is sealed, run the heating and check every joint hot and again cold. Balance the lockshield so the new radiator does not starve others. Black water, persistent air or falling pressure need a heating engineer.
Finishing touches
Mind curtains, doors and furniture in front of the panel. If it replaces a radiator in a communal system, ask the building manager first.
Keep the product sheet and note which end took the flow. Whoever next drains the system or replaces a valve will need both.
For an enquiry, email the product link, a photo of the wall and pipes and a picture of the filling arrangement, once the written details are on the contact form. If the system layout is unknown, say so.
Questions people ask
Can a vertical radiator go on a plasterboard wall?
Only with fixings and support designed for that wall and the filled weight. Supplied screws are often for masonry.
Does it matter which side is the flow?
On some vertical designs, yes. An internal blocker must be on the hot flow side.